Management Team
Charles Campbell III: President
Ed Campbell: Vice President
Troy Gronsky: Vice President
Jeff Williams: Construction Manager
Jim Easterly: Construction Manager
James Doughton: Technical Project Manager
Charles Campbell III: President
Ed Campbell: Vice President
Troy Gronsky: Vice President
Jeff Williams: Construction Manager
Jim Easterly: Construction Manager
James Doughton: Technical Project Manager

Phone: (602) 258-7544
Mesa Schools Online
When Mesa Public Schools launched an initiative to install a fiber optic network to connect every elementary and junior high school classroom to the Internet, PDI Construction was the contractor of choice. We used vacuum excavation to locate existing underground utilities, and horizontal directional drilling to install conduit without disrupting surface traffic or school activities. We placed all necessary manholes and vaults, and our networking services connected the entire system. Once successfully installed, we did the restoration work to finish the job-on time, and on budget.